Quad City Times - Davenport, Iowa

Quad City Times - Davenport, Iowa

Project Description

Duro-Last 50 mil was installed on the Quad City Times building in Davenport, Iowa. The Duro-Last roof replaced a modified roof that was leaking. As a paper distributor, the client was concerned about keeping the humidity low. They chose Duro-Last because of the roofing warranty which included consequential damage to equipment below.

Riddell Roofing used factory flashings and a 3/8" Duro-Fold slip sheet. Riddell Roofing also recommended and installed safety walk pads to the roof-top air conditioners helping to ensure the longevity of the roof.

Product

Duro-Last 50 mil
90,000 sq.ft.

Duro-Last offers:

  • Minimum Disruption To Your Business
  • Installed Year-Round with No Messy Clean-Up
  • Fire Retardant
  • Energy Efficient
  • Wind Resistant
  • 15-Year Duro-Last Roofing Warranty
  • Leak-Proof
  • Maintenance-Free
  • Inspected By Duro-Last Quality Assurance Specialists
  • Made In America

 

duro last logo | Riddell Roofing Aledo IL
Quad City Times | Davenport, IA | Duro-Last Roof

Over 90,000 sq.ft. of Duro-Last 50 mil was installed on the Quad City Times building.

Quad City Times | Davenport, IA | Modified roof before installation

Modified roof prior to Duro-Last installation.

 

Printer Friendly Version (PDF 73kb)